Full-Solid Rubber Track | IAAF-Certified Seamless Surface for Stadiums, Schools & Tennis Courts
Full-Solid Rubber Track | IAAF-Certified Seamless Surface for Stadiums, Schools & Tennis Courts
Full-Solid Rubber Track | IAAF-Certified Seamless Surface for Stadiums, Schools & Tennis Courts
Full-Solid Rubber Track | IAAF-Certified Seamless Surface for Stadiums, Schools & Tennis Courts
Model
PU-006

Item specifics

Color
red, blue, green, yellow, white, etc

Review

Description

Information
Full-solid Rubber Track
Full-solid Rubber Track
Full-solid rubber track is widely used in international and domestic large and medium-sized track and field fields, as well as high standard tracks for large, middle and primary schools. The service life is generally 15 years.
Scope Of Application
Recognized by lAAF and in line with international competition standards, the bottom layer is cast with two-component polyurethane, and the surface layer is mechanically sprayed with colored particles and polyurethane slurry.
Product Features
1. Environmentally friendly and non-toxic
2. Good weather resistance
3. Strong friction force
4. Excellent drainage
5. Excellent elasticity
6. Soft colors
7. Strong adhesive force
8. Convenient maintenance
Layered Diagram
Full-solid Rubber Track
Full-solid Rubber Track
Material Parameter
Full-Solid Rubber Running Track Material Parameter
Parameter Name
Parameter Value
Main Ingredients
Polyether Polyol,Isocyanate
Density
1-1.2g/cm³
Polymer Content
40-50%
Shore A Hardness
≥45
Tensile Strength (Mpa)
≥0.6
Fracture Elongation Rate /%
≥50
Vertical Deformation /mm
1.0-3.0
Thickness
Average thickness 13mm, minimum not less than 10mm
Slope Requirements
Longitudinal slope ≤ 0.1%, transverse slope ≤ 1.0%
Evenness
The gap under a 2-meter straightedge shall not exceed 3mm.
Drainage Performance
Non permeable type
Heavy metals (lead, chromium, cadmium, mercury) /mg/kg
≤2
Flame Retardancy
I
TVOC Emissions mg/(㎡. h)
≤5.0
Weather Resistance
Aging box 500H, performance qualified
Nail Resistance
Anti spiked shoes
Anti Slip Value (BPN. 20 ℃)
90-110 (Dry Test)
Ingredient List
Full-Solid Rubber Running Track Ingredient List
13mm Plastic Track
Name Of Proportioning Material
Model
Packaging Specifications
Net Weight
Waterproof Primer
LS-001
20L
275mm base diameter * 285mm surface diameter * 362mm height

20kg/barrel
Runway material PU
LS-005
A:200L, B:300L
570mm diameter x 890mm height

A:200kg/barrel,B:300kg/barrel
Running Track Topcoat Red/Green/Blue
LS-007
A:200L, B:250L
570mm diameter x 890mm height
A:200kg/barrel,B:250kg/barrel
EPDM granules (1-3mm)
LS-026
/
25kg/bag
Eco-friendly Catalytic Agent
LS-009
275mm base diameter * 285mm surface diameter * 362mm height or else
20KG/barrel or else
Eco-friendly Diluent
LS-010
20L or 200L
275mm base diameter * 285mm surface diameter * 362mm height
or 570mm diameter x 890mm height
20KG/barrel or 200kg/barrel
Marking Paint
LS-011
5L
5.1kg/barrel
Lead time (within days)
1-7 days, usually within 24 hours
Sales Method
Sell all materials for the ingredient list
Full-Solid Rubber Running Track Ingredient List
Product Certificate
MSDS
MSDS
MSDS
MSDS